Sunday, February 1, 2009

Timing of Sedimentation

One of the documents that I examined at the College of Southern Maryland last week was a published report of the Chief of the US Army Corps of Engineers dated December 12, 1882. The corps had conducted an initial survey to determine how waterways might be improved in the Potomac River drainage. After visual inspection, examination of the 1862 coastal map, and interviewing local residents, the Corps recommended dredging only near the mouth of Port Tobacco Creek. The reasons were twofold:
  1. The completion of the nearby railroad had drawn most of the commercial traffic off of the river, diminishing the need for steamboat access, and
  2. the dredged channel likely would continue filling with sediment.
I'll provide an extended quotation tomorrow.

Jim

No comments:

Post a Comment

We welcome your comments but in an effort to eliminate spam comment posts we have turned on comment moderation. What this means is that your comment gets sent to April via email for approval before it is posted. The only comments that will be rejected are those that are commercial spam.